Recovered planning appeal
If a planning application is refused permission, the applicant may lodge an appeal, which will usually be decided by a planning inspector acting for the Secretary of State.
However, planning appeals can be ‘recovered’ for decision by the Secretary of State. In this case the planning inspector prepares a report recommending how the appeal should be determined and passes this to the Secretary of State. The Secretary of State will then consider the inspector's recommendations and make a decision.
Appeals can be recovered at any stage of the appeal process, even after there has been a planning inquiry.
Appeals that are recovered tend to be:
- Those that relate to important projects of local significance.
- Proposals that give rise to regional or national controversy.
- Proposals that present novel issues or legal difficulties.
- Proposals that relate to the delivery of government policy or other government interests.
- Proposals relating to World Heritage Sites.
- Proposals relating to traveller sites in the green belt.
NB See Written statement by the Parliamentary Under-Secretary of State for Communities and Local Government (Mr. Parmjit Dhanda) June 2008 for more information.
Recovered appeals are determined in the same way as normal appeals, based on written representations, hearings or inquiries.
[edit] Related articles on Designing Buildings
- Called-in planning applications.
- Planning appeal.
- Planning Inspectorate.
- Planning permission.
- Planning related applications for judicial review.
[edit] External references
Featured articles and news
Mental Health Awareness Week with ABS
Architects Benevolent Society programme of activity.
CLC publishes domestic retrofit competency framework
Roadmap of Skills for net zero.
May 13-19: Moving more for our mental health.
Understanding is key to conservation.
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.